Case study films from major UK events — motorsport, design, horticulture, theatre and more — showing Losberger De Boer’s temporary structures at work.
Case study coverage of Losberger De Boer’s temporary structures at one of motorsport’s biggest annual events, capturing the scale of the build alongside the finished spaces in action.
A hero film made to show what the structures deliver on-site — from hospitality suites to trackside viewing.
On-site coverage of Losberger De Boer’s structures supporting Frameless 2025, showing how temporary architecture can host a large-scale visitor experience without compromising on design.
Case study film from the Goodwood Revival, documenting the temporary structures that help bring one of the UK’s most iconic historic motorsport events to life each year.
Coverage from the Farnborough International Airshow 2024, capturing the scale of Losberger De Boer’s structures supporting one of the world’s largest aerospace and defence events.
A look at the temporary structures Losberger De Boer delivered for Photo London 2023, hosting one of the world’s leading photography fairs.
Case study coverage of Losberger De Boer’s temporary structures at Clerkenwell, supporting one of London’s leading design events with flexible, design-led space.
On-site coverage from the RHS Chelsea Flower Show, capturing the temporary structures behind one of the world’s most prestigious horticultural events.
Case study film documenting Losberger De Boer’s temporary structures at the Footprint event, captured on site as part of our ongoing case-study series.
Coverage from West End Live in Leicester Square, London’s biggest free celebration of theatre — documenting the temporary structures that helped bring the festival to life.
Case study film from Royal Holloway, University of London, covering the temporary structures delivered for one of the UK’s leading universities.